Executed Projects

Executed Projects 2018-12-13T10:29:56+05:30

Executed Projects

Sr.No. Clients Work Description Location Sector Type
1. Bharat Oman Refineries Limited Hydrocarbon freeing of process pipelines at COT and VBPL of BORL- Bina India Oil & Gas Plant Piping
2. M/s Ajinkya Engineering Work Molybdenum Tray Welding Job India Defense Structure Job
3. Indian Oil Corporation Ltd. Mr. Ashok Kumar, EIC IOCL Vadinar (ashokkr@indianoil.in) IOCL Vadinar Pump Job India Oil & Gas Plant Piping
4. Indian Oil Corporation Ltd. Mr. Ashok Kumar, EIC IOCL Vadinar (ashokkr@indianoil.in) IPS Anomaly Rectification jobs in SPM Lines (onshore section) under WRPL, Vadinar India Oil & Gas Plant Piping
5. All Cargo Logistics Ltd, Mr. Samson Frank – GM Shore Base Fabrication and Maintenance for M/s BG Exploration and Production India Limited India Oil & Gas Electrical
6. Bharat Oman Refineries Limited Fabrication & Erection of 4″ Pipe Line from ETP inletsump to crude oil tank C and modification in Water draining line of 8 numbers crude oil tanks at Vadinar Gujarat India Oil & Gas Plant Piping
7. Indian Oil Corporation Ltd. Mr. Ashok Kumar, EIC IOCL Vadinar (ashokkr@indianoil.in) Installation of Dual plate check Valve in discharge of new fire fighting pump including supply of mechanical items IOCL WRPL Vadinar India Oil & Gas Plant Piping
8. Bharat Oman Refineries Limited Fabrication and Erection of 42″ pipeline hook-up section between BORL IOCL manifold India Oil & Gas Plant Piping
9. Bharat Oman Refineries Limited Repair and replacement of Medium Velosity Water Spray (MVWS) System of all Crude Oil Tank & Associated works at Crude Oil Terminal, Vadinar, Gujarat India Oil & Gas Plant Piping
10. Special Technical Services (Projects) Prem Kumar- Contracts Manager -EPPC NIMR-Division prem@stsoman.com NIMR Simplification Project Oman Oil & Gas Plant Piping
11. Special Technical Services (Projects) Prem Kumar- Contracts Manager -EPPC NIMR-Division prem@stsoman.com SNES 150012-T4819 Water Outlet Project Oman Oil & Gas Ship Building
12. Bharat Oman Refineries Limited Mud Plugging, Cold Cutting in Existing pipeline at IOCL Vadinar India Oman Oil & Gas
13. Special Technical Services (Projects) Prem Kumar- Contracts Manager -EPPC NIMR-Division prem@stsoman.com Fabrication Works for Amal Solar System Phase 1 Project (STS/EPCC-NIMR/SCA-0036) Oman Oil & Gas Ship Building
14. Special Technical Services (Projects) Prem Kumar- Contracts Manager -EPPC NIMR-Division prem@stsoman.com SNES 150012-T4819 Water Outlet Project Oman Oil & Gas Oil & Gas
15. Bharat Oman Refineries Limited Mud Plugging, Cold Cutting in Existing pipeline at IOCL Vadinar Oman Petro Chemical Oil & Gas
16. Special Technical Services (Projects) Prem Kumar- Contracts Manager -EPPC NIMR-Division prem@stsoman.com Fabrication Works for Amal Solar System Phase 1 Project (STS/EPCC-NIMR/SCA-0036) Oman Oil & Gas Plant Piping
17. Special Technical Services (Projects) Prem Kumar- Contracts Manager -EPPC NIMR-Division prem@stsoman.com Amal Steam Fabrication Phase 1 – C Oman Oil & Gas Plant Piping
18. MKG Group Mr. Sivasankar (Director- Maa Kuthari Global) siva@maakuthariglobal.com Hyflex Project – 200 MLD Independant Water Plant, Oman Oman Oil & Gas Plant Piping
19. Al Hadita Petroleum Services S.A.O.C Oman Mr. Baburaj.S, Contract Manager. , baburaj@ahpsoman.com Manpower Deployment Oman Oil & Gas Plant Piping
20. Elco International Company LLC Manpower Deployment Oman Oil & Gas Plant Piping
21. Vijay Tanks(J.V with Safe Contracting Services) Sanish – Hr Manager sanish@vjtanks.com Manpower Deployment Oman Oil & Gas Plant Piping
22. Galfar Engineering & Contracting SAOG (J.V with Safe Contracting Services) Kunthiya – Vice President khuntia@galfar.com Manpower Deployment UAE Oil & Gas Tank Fabrication
23. Bhawan Engineering Company LLC Rajesh Vasu – Asst. General Manager rajeshv.oilfield@becoman.com Deplyment of Man Power U.A.E Oil & Gas Boiler Piping
24. Special Technical Service & Tebodin Rejeesh Mani – General Manager -EMC-Division ‘Rejeesh.Mani@ststeb.com Fabrication and Erection of piping. Oman Oil & Gas Plant Piping
25. Al Hadita Petroleum Services S.A.O.C Oman Mr. Baburaj.S, Contract Manager. , baburaj@ahpsoman.com Flow line replacement Service – Hook up Fabrication job ( In association with SCS Oman) Oman Oil & Gas Plant Piping
26. Galfar Al Misnad Engg. & Contg. W.L.L, Qatar Mr. Salahudheen.K.P
Project Manager ( Oil & Gas )
Salahudheen@galfarqatar.com.qa
Fabrication, Welding & Installation of Bleed Line Qatar Oil & Gas Pipeline job
27. Cairn Energy. Rajastan, India Mr. K.C.Viswanathan Rajasthan Northern Area Development (RJON 90/01) Mechanical and Piping work at MPT DBN (Ref No: 4600005706) India Oil & Gas Plant Piping (Shut Down)
28. Cairn Energy. Rajastan, India Mr. J.Kannan Rajasthan Northern Area Development (RJON 90/01) Mechanical and Piping work at Mangala FM5 Pre-Producer Well (Ref No: 460005481 PR#1000043941) India Oil & Gas Plant Piping
29. Cairn Energy. Rajastan, India Mr. J.Kannan Rajasthan Northern Area Development (RJON 90/01) Construction of services for Piping and Structural work for FM2 Project (Ref No: 460005839 PR#1000043941) India Oil & Gas Plant Piping
30. Tubecare International Pvt. Ltd.
Mr. Anish Kumar K N | Director anish@tubecare.net
“Cofferdam” Fabrication for Northern Offshore Ltd under M/s Tubecare International Pvt. Ltd. designed by CORE-IRM India Oil & Gas Rig
31. Leighton Welspun Contractors Pvt. Ltd.
Mr. Raju Kankipati | Project Manager raju.kankipati@leighton.co.in
EPC 3 – Integrated Balance Works at Cairn Energy – Rajasthan India Oil & Gas Plant Piping
32. Special Technical Services L.L.C. Al-Harthy Complex, Sultanate of Oman.
Mr. Srinivas Jetty | Project Manager sinivas.j@stsoman.com
On Plot Amin Water Injection Development (EPC Project) Fabrication and erection of approx 5000 inch dia piping job and deployment of Skilled workers C60 Oman Oil & Gas Plant Piping
33. Special Technical Services L.L.C. Al-Harthy Complex, Sultanate of Oman.
Mr. Umesh J Churi | Sr. Procurement Manager umesh.jc@stsoman.com
Deployment of Skilled workers Oman Oil & Gas Plant Piping
34. Petrofac International Ltd. Sharjah Mr. Sivasankar (Director-Osmak Eng. & Contracting siva@osmak.ae Central Processing Facilities (CPF) Phase 1 at Badra Oil Field, Republic of Iraq. Contract Ref. no: 088-12-BD-142-00 Engineering, Procurement & Construction Iraq Oil & Gas Plant Piping
35. Special Technical Services -Tebodin LLC JV (STST) Muscat, Oman Mr. Rejeesh Mani
(Services Manager)
Rejeesh.Mani@ststeb.com
ENGINEERING AND MAINTENANCE CONTRACT – NORTH OMAN
Contract Reference: C311161 – 8” DSS Flow line Construction
Oman Oil & Gas Pipeline job
36. Cochin Shipyards Ltd, Cochin, India Mr. Joby Varghese (Manager-O.F) Joby.v@cochinshipyard.com Ship Building at Cochin Shipyards Ltd. INS Vikrant – India’s indigenous aircraft carrier Engine Room Pipe Fabrication – SS & Cupronical at Cochin Shipyards Ltd. 500 Spools completed India Ship Building Ship Building
37. Cairn Energy. Rajastan, India Mr. Alan Shreev alan.shreeve@cairnindia.com Piping and Structural work at Mangala 13 Infill Well (Ref No: RJON/M208/LOA(S)/1000035892 India Oil & Gas Plant Piping
38. Cairn Energy. Rajastan, India. Rajasthan Northern Area Development (RJON 90/01) Construction of services for Piping and Structural work for FM2 Project. India Oil & Gas Oil & Gas
39. Cairn Energy. Rajastan, India. Rajasthan Northern Area Development (RJON 90/01) Mechanical and Piping work at Mangala FM5 Pre-Producer Well. India Oil & Gas Oil & Gas
40. Cairn Energy. Rajastan, India. Rajasthan Northern Area Development (RJON 90/01) Mechanical and Piping work at MPT DBN . India Oil & Gas Plant Piping
41. Arab Sealine Trading & Contracting L.L.C., Manah, Oman, Mr.Sreekumar. (GM) Sreekumar@arabsealine.com Lekhwair Flow Line Project Deployment of Skilled man power Oman Oil & Gas Pipe Line job
42. Samsung Engineering Co.Ltd. – UAE. (Consultant – Technimont) B77 TAKREER Ruwais Refinery Expansion O&U Project. Civil, Structure, Painting ,Piping Fabrication,Erection and Tie-In Works for the Takreer-Ruwais Refinery Expansion Project at Ruwais- Abu Dhabi. UAE Oil & Gas Plant Piping
43. Galfar Engineering & Contracting SAOG, Muscat,Oman. Mr. S.K.Khuntia Exe.VP khuntia@galfar.com New Darsait STP Project- Contract HAYA/032/2010 Deployment of Skilled man power Oman Oil & Gas Plant Piping
44. Hiap Seng Engineering (M) Sdn Bhd , Malaysia (consultant- Chiyoda Corporation.) Mr. S.K.Mahanty (Director-Maa Kuthari Global skm@maakuthariglobal.com Tokuyama Malaysia Poly Silicon Phase – 2 Project (TMP-2), Malaysia. Piping Installatino and asscociated Activities. Malaysia Oil & Gas Plant Piping
45. Special Technical Services -Tebodin LLC JV (STST) Muscat, Oman Mr. Rejeesh Mani
(Services Manager)
Rejeesh.Mani@ststeb.com
Piping and Structural work Deployment of Skilled man power Oman Oil & Gas Plant Piping
46. Special Technical Services -Tebodin LLC JV (STST) Muscat, Oman Mr.Visoth Kumar
(Contracts Engineer)
Visothkumar.Subramani@ststeb.com
Fabrication and welding of DSS pipe Fahud area Gas early production System pipeline (C-31-1161-STA/021) Fabrication of Piping spools in Fahud workshop of STS (It also included a 15 Days Shut Down using the Man Power capasity of 35 persons under PDO in Lekhwair) Oman Oil & Gas Pipe Line job (DSS/ SDSS Job)
47. Madina Group W.L.L., Qatar Hasif Mohammed (Director Marketting, Seagulf Oil & Gas Development Company, Doha, Qatar) hasifm@seagulfwll.com Shutdown for 2012-13 Oryx GTL and QVC. Piping works (Inconnel & SS) India Oil & Gas Plant Piping
48. Target Engineering Construction Co. LLC Deployment of Manpower UAE Oil & Gas Plant Piping
49. Special Technical Services -Tebodin LLC JV (STST) Muscat, Oman JAMESH JAMES
(Sourcing Officer)
Jamesh@ststeb.com
WI ring main replacement project at Lekhwair Hydrotest on 16” 12.5 mm thick lines. The entire pipe section is 13.1 Km. Test pressure will be 227 Bar. PDO job Oman Oil & Gas Pipe Line job
50. Black Cat Engineering & Construction.W.L.L Hasif Mohammed (Director Marketting, Seagulf Oil & Gas Development Company, Doha, Qatar) hasifm@seagulfwll.com GC09102200/FP EPIC of Sweet Fuel Gas Supply To Dukhan Pipeline Construction – Field Fabrication of 6” CS Pipelines for Qatar Petroleum Qatar Oil & Gas Pipeline job
51. Hydro Carbon Industries LLC Mr. Ravi Nair / Manager- Operations , PO Box 32323, ICAD-1, Abu Dhabi, UAE. Tel : +971 2 6262525, Fax : +971 2 6277630 ASAB Full Field Development Project , Abu Dhabi, UAE. Piping and Structural Fabrication works for ADCO. UAE Oil & Gas Plant Piping
52. Mercury Engineering Hasif Mohammed (Director Marketting, Seagulf Oil & Gas Development Company, Doha, Qatar) hasifm@seagulfwll.com Lusail Development Project CP1 Lusail City District Cooling Pipeline for Sino Hydro Marina Project Qatar Others Pipe Line job
53. Qatar Engineering & Construction Hasif Mohammed (Director Marketting, Seagulf Oil & Gas Development Company, Doha, Qatar) hasifm@seagulfwll.com Shut Down job Stainless Steel Piping Works at Qatar Gas Qatar Oil & Gas Plant Piping
54. Black Cat Engineering & Construction.W.L.L Hasif Mohammed (Director Marketting, Seagulf Oil & Gas Development Company, Doha, Qatar) hasifm@seagulfwll.com EPIC of Ammonia Recovery & Ammonia Flare System Piping Fabrication and Field Erection at QAFCO Qatar Fertilizer Plant Piping
55. Descon Engineering , P.O.Box 46821 , Abu Dhabi, UAE. M-14,United Bank Limited Building,Mussafah Industrial Area. Tel : +971 2 5555807 / Fax : +971 2 5555784 Projects – 1. JGC/Tecnimont Habshan Integrated Gas Development Project – Habshan Abu Dhabi, 2. Hyundai Ruwais Refinery Expansion Project, Boruouge- Ruwais, Abu Dhabi. Deployment of Skilled workers (Welders,Pipe Fabricators and Pipe Fitters) at Habshan, Ruwais UAE Oil & Gas Plant Piping
56. Welspun Maxsteel Ltd. PGH Radiant Tubes/Fittings replacements 2012 (Shutdown Project)  Replacement of Process gas heater radiant section tubes / fittings (U bends, Elbows). The process gas heater is located at 86 meters level of Reactor Structure. The tube fitting material is HP 40 (25 Cr, 35 Ni) & HP 35 Cr-45 Ni. It was a 25 days Shutdown job with a man power of 110. Job was done in Joint Venture with M/s Shilpi Engineering Pvt. Ltd. India Steel Plant Piping
57. Pureworld Middle East Thomas Mathew V.
HR/Admin. Manager, P.O.Box 61708, Abu Dhabi, U.A.E
email: thomas.mathew@pureworldme.com
Deployment of Skilled workers UAE Oil & Gas  Plant Piping
58. Petrofac International Ltd. Al Khan Road, Sharjah, UAE. Mr. Shahid Siddique ASAB Full Field Development (FFD) Project (ADCO Project No: P14333) (JV with Coral Edge, UAE) (Prime) Supply of Skilled and Semi Skilled Technicians UAE Oil & Gas Plant Piping
59. Galfar Al Misnad Engg. & Contg. W.L.L, Qatar. Mr. Satish G Pillai (CEO) galfarceo@qatar.net.qa GC09100500 EPIC for Oily Water Effluent Pipeline Hydro testing of Effluent Water Pipeline Qatar Oil & Gas Plant Piping
60. Galfar Engineering & Contracting SAOG, Muscat,Oman. Mr. Baburaj(PM) baburaj@galfar.com Kazan Oil Field Wadi Mussalam. (Sub Contract) BP Project to Construct a Flow line and Export line. Our scope included 10″ & 6” lines connecting in 20” header and then to plant. 12″ Oil line & 4” Gas line from Plant to PDO pipe line in Saihrawl station. 3200 joints of 12”, 4”, 1000 joints of 10”. Repair rate in all was upto 7% only. Oman Oil & Gas Plant Piping
61. Dodsal Engineering & Construction LLC, Oman Mr. Reji Balakrishnan (QA/QC Inspector) +971 562297076 rejibalakrishnan@gmail.com GC10100600 EPIC for Produced Water Treatment & Injection – Phase 2Pipeline Construction – Field Fabrication of 10” & 12” CS Pipelines (QP Project) Qatar Oil & Gas Pipe Line job
62. Black Cat Engineering & Construction.W.L.L Hasif Mohammed (Director Marketting), Seagulf Oil & Gas Development Company, Doha, Qatar. hasifm@seagulfwll.com GC10100600 EPIC for Produced Water Treatment & Injection – Phase 2Pipeline Construction – Field Fabrication of 10” & 12” CS Pipelines (QP Project) Qatar Oil & Gas Plant Piping
63. Galfar Engineering & Contracting SAOG, Muscat,Oman. Mr. Baburaj(PM) baburaj@galfar.com Flare Stack Construction for Galfar Oman at Pune workshop of Ador Welding Ltd. (Sub Contract) Complete bottom section Fabrication of Flare Stack which to be erected in Oman Gas processing plant at Oman. India Fertilizer Plant Piping
64. Hi-Point Services (I) Pvt Ltd. Mumbai, India Revamping jobs of INS VIRAAT at Cochin Shipyards Ltd. (CSL)
Maintenance of STP related piping on board INS VIRAAT.
India Ship Building Ship Building
65. Galfar Al Misnad Engg. & Contg. W.L.L, Qatar. Mr. Satish G Pillai (CEO) galfarceo@qatar.net.qa GC 09109400 EPIC For Produced Water Treatment & Injection in Dukhan Fields (QP Project) 1. Pipeline Construction – Field Fabrication of 12” CS Pipelines. 2. Hydro Testing of Produced Water Injection Pipeline- 12” Pipeline (2 pipeline 3 km & 6 km) 3. Leak Testing Service for Produced Water Injection Pipeline- 12” Pipeline (2 pipeline 3 km & 6 km) 4. Hydrotesting Milestone 2 Qatar Oil & Gas Pipeline job
66. Cairn Energy. Rajastan, India Mr. Alan Shreev alan.shreeve@cairnindia.com Mangala Terminal Expansion Project under Cairn Energy. (Sub Contract) The complete execution of the job employing nearly 600 personal including Project Manager, Engineers and Supervisors India Oil & Gas Plant Piping
67. Petrofac International Ltd. Sharjah Mr. Sivasankar (Director-Osmak Eng. & Contracting siva@osmak.ae ASAB Full Field Development (FFD) Project (ADCO Project No: P14333) (JV with Osmak, UAE) (Prime) Construction of new unit and maintenance UAE Oil & Gas Plant Piping (DSS/ SDSS Job
68. Bharati Shipyards Ltd., Mangalore, Karnataka, India Ship Building – Multipurpose Supply Vessel
Fabrication and Erection of piping and Hull.
India Ship Building Ship Building
69. Galfar Al Misnad Engg. & Contg. W.L.L, Qatar. Mr. Satish G Pillai (CEO) galfarceo@qatar.net.qa MS 234 at Masied (QGPC project) under Galfar, Qatar. (Sub Contract) Construction of Crude pipe Lines of 6” – 24” size & 2” Air Line with Full Fabrication, Erection & Hydro Testing for the newly constructed 4 Oil tanks of QP. Our scope also include Pump connections of the Tanks, connecting old lines with newly erected one, Erection of new Fire Water line, and Tapping connection for the Compressor line in Pump House. Qatar Oil & Gas Plant Piping
70. GNFC, Bharuch, Gujrat Mr. A.S.Modi (Sr. Manager (Projects) asmodi@gnfc.in WNA Project at GNFC Bharuch. (Sub Contract) Piping, Fabrication & Erection job for WNA Project at GNFC, Bharuch under IOT (It also included a 60 Days Shut Down using the Man Power capasity of 275 persons) India Fertilizer Plant Piping
71. Black Cat Engineering & Construction.W.L.L Hasif Mohammed (Director Marketting, Seagulf Oil & Gas Development Company, Doha, Qatar) hasifm@seagulfwll.com Ship Building – Multipurpose Supply Vessels for Timblo Dry docks Pvt. Ltd. at Goa.
Fabrication and Erection of piping and Hull including Skeg, Deck House and Wheel House.
India Ship Building Ship Building
72. Galfar Eng. & Contracting W.L.L Abu Dhabi-UAE. Mr. S.K.Khutia (Exe. VP (O&G-S)) Khuntia@galfar.com Reactivation of Water Injection Cluster 46, 47 & 49 at Bu Hasa (ADCO Contract No: 15202 .01/ EC 1075), Client: Galfar UAE. (Prime) The project was to Construct 8”dia, 12.7mm Wall Thickness Cross Country Pipeline – Total length covered was 26 Km (inclusive of all clusters). UAE Oil & Gas Pipe Line job
73. Petrofac International Ltd. Sharjah, UAE Mr. Jim Burtan (PM) Jim.b@petrofac.com Revamping jobs of INS VIRAAT at Cochin Shipyards Ltd. (CSL) & INS GOMATI at Mumbai
Maintenance of STP related piping on board INS VIRAAT.
Algeria Ship Building Plant Piping
74. Hi-Point Services (I) Pvt Ltd. Mumbai, India EPIC of Ammonia Recovery & Ammonia Flare System Piping Fabrication and Field Erection at QAFCO India Ship Building Ship Building
75. Adyard Abu Adhabi L.L.C Abu Dhabi, UAE. Piping & Structure job in Adyard Abu Adhabi L.L.C yard at Abu Dhabi.
It was to supply Supervisory and Skilled Workforce in JV with IOSS, Oman.
Oman Oil & Gas Plant Piping
76. Gulf Petrochemical Services & Trading L.L.C (GPS) Al Khuwair, Oman Piping & Structure job under Occidental at Mukhaizna site of Gulf Petrochemical Services & Trading L.L.C (GPS)
Supply of Supervisory and Skilled Workforce in JV with IOSS, Oman.
Oman Petro Chemical Plant Piping
77. The Oman Construction Company L.L.C. Muscat, Oman Piping & Structure job under Occidental at Mukhaizna sites of The Oman Construction Company L.L.C (TOCO)
Supply of Supervisory and Skilled Workforce in JV with IOSS, Oman.
Oman Oil & Gas Plant Piping
78. Galfar Engineering & Contracting SAOG, Muscat,Oman. Mr. Baburaj(PM) baburaj@galfar.com 38” MOL (Main Oil Line) Project under Galfar at Muscat, Oman. (Sub Contract) Project was a PDO job to replace the Main Oil Line which collect the Crude from various pipelines and then transferring it to Refinery. We have collaborated with IOSS and worked under GALFAR. From the total project, our scope was from 20.5 Km to 65.5 Km of the Main Oil Line. It was a CS – Class 1 Pipe with size 38” X 12.3mm X12 Meter. We had used a Total Man Power of 120 persons + 10 Supervisors. UAE Ship Building Ship Building
79. Tebma Shipyards Ltd. Malpe, Mangalore, India. Construction of Platform Supply Vessels Fabrication and Erection of piping and Hull. India Ship Building Ship Building
80. Bahwan Engineering Company L.L.C, Muscat, Oman Mr. Prasad.K.S Prasad.oilfield@becoman.com SRDC Project at Saihrawl, Oman under Bahwan Engineering Company. (Sub Contract) Construction of DSS pipeline for new unit in the Gas processing plant at Saihrawl. Total inch dia 1Lakh (60000 Fabrication & 40000 Erection). We had done the job in JV with IOSS, Oman, Client-PDO, Contractor-TR Oman. Oman Oil & Gas Plant Piping (DSS/ SDSS Job)
81. Reliance Industries Limited, Jamnagar, Gujarat, India Coil Fabrication and Erection of Crude Distillation Unit and Clean Fuel Unit Heater at Reliance – Jamnagar (Gujarat), India.
Fabrication and Erection of piping.
India Oil & Gas Plant Piping
82. NTPC Bilaspur, India. 660MW Super Critical Boiler at NTPC Bilaspur, India under L&T. (Sub Contract) Fabrication and Erection of total piping for Boiler unit. India Power Boiler Piping
83. Galfar Engineering & Contracting SAOG, Muscat,Oman. Mr. Baburaj(PM) baburaj@galfar.com FFWI – (Full Field Water Injection Project) – Al-Burj, Oman. (Sub Contract) Full Field Water Injection Project is a 50 Km PDO Pipeline Job (32 Km Underground & 18 Km Above ground) at Al-Burj, Muscat, Oman. We had successfully completed the job, which was awarded by Galfar –Oman, in collaboration with IOGS. Project was using CS – X60 Pipe of 12” 12.5 mm for above ground and 10mm for underground. Oman Oil & Gas Pipe Line job
84. NSF Sudan. Bioremediation project under NSF at Heglic & Munga, Sudan. (Sub Contract) It was a Cross Country pipeline project and our scope was to supply skilled and unskilled persons. Sudan Oil & Gas Cross Country Pipeline
85. IFFCO Aonla, Bareilly, UP, India Re-Vamping of R.G. Boiler at IFFCO Aonla, Bareilly, UP, India under Dowel Erectors. (Sub Contract) Fabrication and Erection of total piping for Boiler unit. India Fertilizer Boiler Piping
86. Galfar Engineering & Contracting SAOG, Muscat,Oman. Mr. Baburaj(PM) baburaj@galfar.com Mebrook Gas Line Project, Oman.
The job was to construct 12” Cross country Pipeline. It was a PDO job done in association with IOSS.
Oman Oil & Gas Cross Country Pipeline
87. Gulf Piping Company W.L.L (GPC) Abu Dhabi, UAE. Piping & Structure job under GPC at Abu Dhabi yard, UAE. (Sub Contract) It was a Piping as well as a Structure Construction job. UAE Oil & Gas Plant Piping
88. Arabian Industries L.L.C, Muscat, Oman Piping job for Sohar Methanol Plant under Arabian Industries, Oman. (Sub Contract) The project included construction of Piping and Structure. Our scope was from Fabrication and Installation of piping to Commissioning of plant. This job was also for PDO under Arabian Industries. Oman Petro Chemical Plant Piping
89. RCF, Chembur, India Mr. A.M.Swami (CGM) +91 9820601581 Technology up-gradation of Syn – Gas Compressor for Ammonia – V at RCF, Chembur, India under Dowel Erectors. (Sub Contract) Turn Key Project – Fabrication and Erection of total piping of new Ammonia plant unit. (It included a 45 Days Shutdown with a man power team of 140 persons) India Fertilizer Plant Piping
90. RCF, Chembur, India Mr. A.M.Swami (CGM) +91 9820601581 SYN Gas Compressor related piping job at RCF, Chembur, India under Dowel Erectors. (Sub Contract) Fabrication and Erection of piping in Ammonia plant. India Ship Building Ship Building
91. Galfar Engineering & Contracting SAOG, Muscat,Oman. Mr.Baburaj(PM) baburaj@galfar.com Kawther Gas Plant and Associated facilities -C31/ 0514 Job No. 07/804. Client Galfar Oman. (Sub Contract) It was a Heavy Wall DSS piping job under PDO. Our scope included fabrication and welding of 35000 Inch Dia of SS & DSS piping & Erection. Oman Oil & Gas Plant Piping (DSS Job)
92. Galfar Engineering & Contracting SAOG, Muscat,Oman. Mr. Baburaj(PM) baburaj@galfar.com Off Plot Delivery Contract for North Oman C- 31/ 0603 (07-798) – at Qarnalum under Galfar, Oman. (Sub Contract) Construction of 6”, 8” & 10” Gas pipe lines (Schedule 20) under Galfar and the client was PDO. Oman Oil & Gas  Pipe Line (DSS Job)
93. Tebma Shipyards Ltd. Cochin, India. Construction of Eight numbers of Dynamic Propulsion Positioning FiFi One, PSV Vessels Fabrication and Erection of piping and Hull. India Ship Building Ship Building